Skip to main content

PEC Monthly Review: September 2026

Published:
2 min read
•Verified PEG Publication

Period: 1–30 September 2026

September 2026 brought the formal Brain Gain Portal inauguration and the next GET steps.

Highlights

  • 4 September (Item 36). APP reported a one-month skills training for 1,400 GET Phase-II trainees in two waves of 700. The first wave ran from 1 to 30 September; the second is scheduled for 1 to 31 October.
  • 8 September (Item 62). PEC’s ADR Division held an awareness workshop on construction dispute resolution with the SAAROSH ADR Centre at PEC Headquarters.
  • 15 September (Item 9). The Brain Gain Portal for overseas Pakistani engineers was formally inaugurated at PEC Headquarters, Islamabad. It had been soft-launched in April 2025.
  • 17 September (Item 59). In Muzaffarabad the Chairman met the Chief Secretary of Azad Jammu and Kashmir and briefed him on the GET Placement Program. A 3C Interactive Session was agreed.
  • 25 September (Item 60). The second Young Engineers Personality Development Programme was launched at NDU for GET Phase-II, Batch-I, as reported by APP.

Announced

  • 8 September (A19). Announced: a National ADR Centre to be operating by the end of 2026. Not yet delivered.

Item numbers match the Detailed Review. Dates and figures are shown as published; where sources differ, the source is named. See all items, with sources, on the Track Record page.

Categories:PEC Updates
Share:

Related Perspectives

View all articles →